Queensland Rail Flynn Backup Generator Replacement

Project Description

CLIENT: Queensland Rail

TIME FRAME: 5 Days

KEY ACHIEVEMENTS:

  • Closure Planning interface
  • Construction:
    • Gen set Foundation installation
    • Conduit route and cable installation Power and signalling
    • Termination of Generator and standby power systems Equipment
    • Brown field Power modifications
  • Commissioning:
    • Brown field Power supply Modifications cut over
    • Test and commission Generator Set to QR specification
    • Test run Generator set for 24 Hours.
  • On-time asset handover to Operations and Maintenance Representative